Skip to content
HP-488 Masjid original front elevation

Erigavo / acoustic design

Acoustic Design in Erigavo

Acoustic design reduces noise between rooms and from outside by placing rooms and openings well. This guide explains the basics. Somdesign Architects considers sound in the layout.

From first sketch to drawing set.Erigavo

02 / Your location

acoustic design in Erigavo.

Erigavo is a cool, green highland town. For construction, the cooler highland air means less corrosion and milder heat, though the higher, more remote location calls for early planning of deliveries.

In Erigavo, planning acoustic design means the cooler highland air means less corrosion and milder heat, though the higher, more remote location calls for early planning of deliveries. Somdesign Architects turns the brief and the plot into a drawing set issued for construction.

Project locationErigavo

Share the plot location and project scope with our Hargeisa office to discuss availability and site arrangements.

Discuss your location ↗
01

Architectural design

Each client’s brief and plot become the first plan.

02

Drawing sets

Plans, elevations, sections and renders, checked with the client.

03

Design to construction

The set is issued for construction to Hill Development.

03 / HP-488 Masjid

From the drawing to the design.

Explore the original front elevation and architectural visualization of the same project.

HP-488 original front elevation
HP-488 · Sheet A-004 · Front elevation
Architectural presentation workspace

The studio process

Brief. Design. Hand to Hill.

Plans, elevations, sections and renders, checked with the client. The set is issued for construction to Hill Development.

04 / Your questions

Before we begin.

How is noise reduced in a design in Erigavo?

By placing quiet rooms away from the street and separating the loud areas from the bedrooms.

What should I consider when planning a house in Erigavo?

Erigavo is a cool, green highland town. The cooler highland air means less corrosion and milder heat, though the higher, more remote location calls for early planning of deliveries.

Why plan for sound early?

Sound is set by the layout and the construction, which are harder to change after the home is built.

Start a conversation

Tell us what you want to build.

Share your project in Erigavo with the team.

Message on WhatsApp ↗info@somdesignarchitects.com+252 63 4428686