Skip to content
HP-488 Masjid original front elevation

Garowe / the site survey

Site Survey and Measurement in Garowe

The site survey records the plot size, the levels and the existing features before the design starts. This guide explains what it covers. Somdesign Architects starts every design from the surveyed plot.

From first sketch to drawing set.Garowe

02 / Your location

the site survey in Garowe.

Garowe is an inland capital of Puntland with a hot, semi-arid climate. For construction, the hot, dry inland climate calls for shaded openings and insulation, with materials moved in by road.

In Garowe, planning the site survey means the hot, dry inland climate calls for shaded openings and insulation, with materials moved in by road. Somdesign Architects turns the brief and the plot into a drawing set issued for construction.

Project locationGarowe

Share the plot location and project scope with our Hargeisa office to discuss availability and site arrangements.

Discuss your location ↗
01

Architectural design

Each client’s brief and plot become the first plan.

02

Drawing sets

Plans, elevations, sections and renders, checked with the client.

03

Design to construction

The set is issued for construction to Hill Development.

03 / HP-488 Masjid

From the drawing to the design.

Explore the original front elevation and architectural visualization of the same project.

HP-488 original front elevation
HP-488 · Sheet A-004 · Front elevation
Architectural presentation workspace

The studio process

Brief. Design. Hand to Hill.

Plans, elevations, sections and renders, checked with the client. The set is issued for construction to Hill Development.

04 / Your questions

Before we begin.

What does a site survey cover in Garowe?

The plot size, the levels, the boundaries and the existing features, so the design starts from accurate measurements.

What should I consider when planning a house in Garowe?

Garowe is an inland capital of Puntland with a hot, semi-arid climate. The hot, dry inland climate calls for shaded openings and insulation, with materials moved in by road.

Why measure before designing?

A design drawn from wrong measurements is costly to correct, so the survey comes first.

Start a conversation

Tell us what you want to build.

Share your project in Garowe with the team.

Message on WhatsApp ↗info@somdesignarchitects.com+252 63 4428686